Cookie settings

Choose what this browser shares on golain.io. We remember your decision for 180 days. Rejecting optional tracking does not stop you browsing or contacting us.

Read about providers, storage and your rights

What would you like to improve?

Leave your email for an expert’s response. Choose a topic or add details if you like — no meeting required.

Work and personal email addresses are both welcome.

Add optional details

We use these details to respond to this request. Privacy policy. Optional cookies are not required.

Prefer to talk? +91 986 001 9933 · Email us directly

Find The Time

Your OEE Report Is Missing.

Most plants can calculate OEE. The harder question is where the lost time actually went. Golain connects each stop and speed loss to the responsible asset, hour and operating condition so the team knows what to improve.

WHAT TO MEASURE FIRST

Lost minutes

Establish where availability and speed losses occur by asset, hour and cause before setting an improvement target.

SET THE SITE BASELINE BEFORE MAKING AN IMPROVEMENT CLAIM

WHAT CHANGES FOR THE TEAM

Same Line. Same Hour. Different Number.

TODAY
  • Losses categorised at the end of the shift.
  • Micro-stops invisible below the reporting threshold.
  • Performance loss blamed on the operator.
CURRENT WORKFLOW · BASELINE REQUIRED
WITH GOLAIN
  • Every lost minute attributed as it happens.
  • Micro-stops counted and grouped by cause.
  • Performance loss attributed to asset and condition.
CHANGE · MEASURED AGAINST THE SAME BASELINE

HOW IT WORKS

Three Practical Changes.

Connect every loss to an asset and time

Use machine events to show where the lost minutes occurred instead of asking the shift to categorise them later.

Group repeated short stops

Bring small recurring events together so the team can see when one pattern is creating a material production loss.

Compare with a proven operating hour

Use a strong hour the line has already achieved as a practical reference for the current shift.

WORKED EXAMPLE

From An OEE Gap To A Ranked Loss List.

A shift can report acceptable availability while repeated short stops still remove meaningful production time.

ONE WORKFLOW · FROM SIGNAL TO VERIFIED RESULTSITE-SPECIFIC
SHIFTCollect every stop and speed loss
GROUPCombine repeated events by asset and cause
RANKOrder the losses by minutes and output affected
VERIFYCompare the next shift with the same baseline
VIEW
By asset
RANK
By minutes
PROOF
Vs baseline

START WITH ONE PROBLEM

Start With The Problem You Already Measure.

Bring the current workflow and baseline. We will map the evidence needed, the people involved and the smallest useful result to prove.

WHAT HAPPENS NEXT
We reply within one business day.
An expert reviews your operation and the problem you want to solve.
Book a follow-up call if it helps.